Loading Case 1 · Generalised Global Gradient hydraulicsGA Network
GA Network
Optimisation Dashboard
Optimise 25 pipe diameters across the two-reservoir network, then review how cost, pressure feasibility and population diversity evolve through every generation.
25decision pipes
14demand nodes
22diameter options
Check a candidate design
P1 to P25 orderPaste pipe diameters and evaluate
Paste one Google Sheets column containing exactly 25 values. Units such as “600 mm” are accepted.
No design evaluated yetPaste your P1–P25 diameter column, then select Evaluate design.
Best design at generation 0
Network configuration
100 mm1500 mm
Selected pipeP1
ConnectionN1 → N2
Diameter600 mm
Length6,500 m
Flow—
Velocity—
Generation history
Convergence and feasibility
Best costFeasible share
GenBest costMin pressureFeasible
Design schedule
Supplied designOptimised pipe sizes
| Pipe | Nodes | Length | Diameter | Unit cost |
|---|---|---|---|---|
| P1 | 1–2 | 6,500 m | 600 mm | $2,460/m |
| P2 | 2–3 | 3,900 m | 525 mm | $2,220/m |
| P3 | 3–4 | 3,900 m | 450 mm | $1,800/m |
| P4 | 5–4 | 11,000 m | 675 mm | $2,890/m |
| P5 | 2–6 | 3,900 m | 450 mm | $1,800/m |
| P6 | 4–8 | 3,900 m | 450 mm | $1,800/m |
| P7 | 6–7 | 3,900 m | 300 mm | $950/m |
| P8 | 7–8 | 3,900 m | 375 mm | $1,470/m |
| P9 | 6–9 | 3,900 m | 450 mm | $1,800/m |
| P10 | 7–10 | 3,900 m | 225 mm | $700/m |
| P11 | 8–11 | 3,900 m | 375 mm | $1,470/m |
| P12 | 9–10 | 3,900 m | 100 mm | $424/m |
| P13 | 10–11 | 3,900 m | 100 mm | $424/m |
| P14 | 11–12 | 3,900 m | 100 mm | $424/m |
| P15 | 10–13 | 4,000 m | 225 mm | $700/m |
| P16 | 12–14 | 4,000 m | 450 mm | $1,800/m |
| P17 | 13–15 | 3,900 m | 450 mm | $1,800/m |
| P18 | 15–14 | 3,900 m | 525 mm | $2,220/m |
| P19 | 11–15 | 4,000 m | 525 mm | $2,220/m |
| P20 | 9–16 | 4,000 m | 525 mm | $2,220/m |
| P21 | 16–13 | 3,900 m | 450 mm | $1,800/m |
| P22 | 6–10 | 5,000 m | 300 mm | $950/m |
| P23 | 8–12 | 5,000 m | 450 mm | $1,800/m |
| P24 | 10–15 | 5,000 m | 225 mm | $700/m |
| P25 | 3–7 | 3,900 m | 450 mm | $1,800/m |
Loading Case 1
19 m criterionNode pressure audit
| Node | Demand | Elevation | Head | Pressure |
|---|---|---|---|---|
| N2 | 70.3 L/s | 320 m | — | — |
| N3 | 70.3 L/s | 319 m | — | — |
| N4 | 51.8 L/s | 333 m | — | — |
| N6 | 83.3 L/s | 310 m | — | — |
| N7 | 138.8 L/s | 312 m | — | — |
| N8 | 83.3 L/s | 311 m | — | — |
| N9 | 70.3 L/s | 304 m | — | — |
| N10 | 120.3 L/s | 306 m | — | — |
| N11 | 83.3 L/s | 311 m | — | — |
| N12 | 70.3 L/s | 304 m | — | — |
| N13 | 120.3 L/s | 311 m | — | — |
| N14 | 74.0 L/s | 316 m | — | — |
| N15 | 83.3 L/s | 308 m | — | — |
| N16 | 74.0 L/s | 311 m | — | — |